GLOBAL OFFICES: NORTH AMERICA · EUROPE · MIDDLE EAST · SOUTH ASIA ISO 27001 · SOC 2 CERTIFIED

Services / Cloud / Cloud Ops & Migration

Move to the cloud without the downtime horror stories.

Sequenced migration plans with rollback paths at every stage, so a move to AWS, Azure, or GCP doesn't become a weekend of firefighting.

Talk to our team

OUR METHODOLOGY

A migration plan with a rollback path at every step.

01
Discover
Map dependencies across every workload before touching one.
02
Design & Build
Sequenced move plan with cutover and rollback steps defined.
03
Pilot & Verify
A low-risk workload moves first to prove the process.
04
Scale & Operate
Post-migration tuning once workloads have settled in.
Migration Planning
Dependency mapping and sequencing before a single workload moves.
Workload Assessment
A clear picture of what's cloud-ready and what needs re-architecture first.
Cutover & Rollback Planning
A tested path back if a cutover doesn't go as planned.
Post-Migration Optimisation
Right-sizing and cost tuning once workloads have settled.

INDUSTRIES WE SERVE

CASE STUDIES

Vantage Telecom

CASE STUDY

Vantage Telecom
Migrated core billing to the cloud with zero downtime.
Solace Health Network

CASE STUDY

Solace Health Network
Cloud-native patient portal scaled to 500K users.
Northfield Retail Group

CASE STUDY

Northfield Retail Group
Peak-season traffic handled without a single outage.
Fenwick Analytics

CASE STUDY

Fenwick Analytics
Cloud cost cut 30% after a full workload review.
Brightline Logistics

CASE STUDY

Brightline Logistics
Legacy tracking system replatformed in 4 months.
Union City Services

CASE STUDY

Union City Services
Citizen portal migrated to gov cloud, audit-ready.

FAQ

Cloud Ops & Migration — questions, answered.

How does AGS migrate us to the cloud without downtime?

AGS builds sequenced migration plans with a rollback path at every stage, so a move to AWS, Azure, or GCP doesn't become a weekend of firefighting. We map dependencies across every workload before touching one, move a low-risk workload first to prove the process, then tune once workloads have settled. Vantage Telecom migrated core billing with zero downtime.

What is a cloud migration rollback plan and why does it matter?

A rollback plan is a tested path back if a cutover doesn't go as planned. It matters because an unrecoverable migration is how downtime horror stories start. AGS defines cutover and rollback steps before moving anything, and proves the process on a low-risk workload first, so you're never committed without an exit.

How do you know which workloads are ready to move to the cloud?

We run a workload assessment that gives you a clear picture of what's cloud-ready and what needs re-architecture first. Dependency mapping and sequencing come before a single workload moves, so nothing migrates in the wrong order. That assessment shapes the sequenced move plan and the rollback steps defined for each stage.

Which cloud platforms does AGS migrate to?

AGS runs migrations to AWS, Azure, and GCP. The approach is the same across all three: map dependencies before touching a workload, sequence a move plan with cutover and rollback steps, prove it on a low-risk workload, then right-size and cost-tune once workloads have settled in. The goal is a migration you won't have to explain later.

Plan a migration you won't have to explain later.

Tell us what you're building and we'll map the fastest path to it.

Let's talk